Every installation starts with a site survey. We assess your roof or land, shading, structure and electricity consumption, then return with a system design and a feasibility study showing expected output and savings.
Once you approve the design, our team supplies and installs the modules, inverters, mounting structures and protection equipment. We handle authority approvals and grid connection with DEWA, SEWA, FEWA or ADDC, depending on your emirate, then test and commission the system before handover.
On-grid, hybrid or off-grid
We design around how you use power: grid-connected systems that cut your bill, hybrid systems that add batteries or a generator for backup, and off-grid systems for sites without a reliable grid connection.